Denim manufacturer cuts energy use per unit
Before: coal-heavy drying process. After: heat-recovery retrofit and process resequencing.
Funded by
the European Union
Get inspired by companies that achieved concrete results in their green transition.
Before: coal-heavy drying process. After: heat-recovery retrofit and process resequencing.
Before: mixed-material packaging. After: mono-material recyclable format aligned with PPWR direction.
Before: fixed-route diesel fleet. After: route optimisation software plus partial fleet renewal.
Before: no CBAM-ready data. After: full embedded-emissions dataset ready for buyer requests.
Before: flood irrigation across orchards. After: sensor-guided drip irrigation network.
Before: offcuts sent to landfill. After: on-site take-back and recycling partnership.