Denim manufacturer cuts energy use per unit
Before: coal-heavy drying process. After: heat-recovery retrofit and process resequencing.
Funded by
the European Union
Get inspired by companies that achieved concrete results in their green transition.
Before: coal-heavy drying process. After: heat-recovery retrofit and process resequencing.
Before: mixed-material packaging. After: mono-material recyclable format aligned with PPWR direction.
Before: fixed-route diesel fleet. After: route optimisation software plus partial fleet renewal.
Before: no CBAM-ready data. After: full embedded-emissions dataset ready for buyer requests.
Start with a lighting and motor audit — often the fastest payback before larger retrofits.
Segregate waste streams at source to unlock higher-value recycling and resale options.
Meter water use by process step before investing in efficiency equipment.
Build a simple scope 1–2 baseline before setting reduction targets.
Map tier-1 suppliers first — most buyer questionnaires start there.