Case study · Carbon Reduction Examples
Denim manufacturer cuts energy use per unit
Before: coal-heavy drying process. After: heat-recovery retrofit and process resequencing.
−22%
Carbon reduction
+18%
Resource efficiency
€64k/yr
Cost savings
Challenge
High coal consumption and volatile energy costs in the drying line.
Solution
Waste-heat recovery exchangers were installed and process steps resequenced.